Metal Roof Calculator
Calculate slope-adjusted panel run, stock panel pieces, ridge/eave/rake trim, screw boxes and closures, then check inventory, budget or supplier pricing.
Build the material takeoff
How this estimate is calculatedFormula, rounding and example
How the metal-roof estimate is built
- 1Use building width, overhang and roof pitch to calculate the sloped panel run and total roof area.
- 2Divide roof width by panel coverage width for strips per slope, then use stock panel length and end lap to determine pieces per strip.
- 3Calculate ridge, eave and rake trim, screws and closures independently and round each to whole stock units.
Uses a 40 × 28 ft building, 6:12 pitch, 1 ft eave overhang, 36 in panel coverage and 16 ft stock. It returns 56 panel pieces, 5 ridge pieces, 9 eave pieces, 8 rake pieces, 6 screw boxes and 40 closure pieces.
Use your own measurements and verify product coverage, local requirements and supplier terms before ordering.
Common metal-roof calculator questions
How many metal roof panels do I need?
Calculate the sloped panel run from roof geometry, count panel strips from coverage width, then determine how many stock-length pieces each strip requires after end-lap rules.
Why does panel coverage width matter?
Nominal panel width and actual coverage width can differ because panels overlap. Use the manufacturer’s coverage width for strip count.
What else belongs in a metal-roof takeoff?
Ridge, eave and rake trim, screws and closure pieces should be calculated separately from the panel count because each uses different dimensions and packaging.