Dry Creek Bed Calculator
Combine multiple channel segments, split the order into a custom boulder/cobble/pebble mix, estimate fabric and optional edge accents, check rock on hand, work backward from a budget, or compare bulk suppliers.
Map the channel you plan to build
The fabric estimate adds the channel bottom width, the measured length of both sides, and the selected extension beyond both banks, then applies your fabric allowance. It is not calculated from plan area alone. A 1 ft extension per bank is an editable starting assumption, not a specification. For seams, follow the fabric maker’s instructions; 6–12 in overlap may be appropriate for some installations, but the calculator does not determine the number of seams or the roll layout.
How this estimate is calculatedFormula, rounding and example
How the dry-creek-bed estimate is built
- 1Calculate each section’s trapezoidal rock volume using its top width, side-slope run and depth, then add the sections together. This assumes the modeled channel depth is filled with rock.
- 2Apply the rock allowance and convert the volume to tons using the entered density before splitting tonnage across the selected boulder, cobble and pebble mix.
- 3Calculate fabric from the channel bottom width plus both sloped side lengths and the extension beyond each bank, then apply the fabric allowance. Check roll width and seam overlaps separately; count edge accents using the entered spacing.
Two sections (20 × 3 ft and 10 × 4 ft, both 6 in deep) with vertical sides and 1 ft fabric extension per bank require 50 cubic feet of rock. With 10% rock allowance that is about 2.04 cubic yards or 2.95 tons; with 10% fabric allowance the estimate is 209 sq ft of fabric, plus 12 edge accents at 5 ft spacing.
Use your own measurements and verify product coverage, local requirements and supplier terms before ordering.
Common dry-creek-bed calculator questions
How much rock does a dry creek bed need?
Add the volume of each channel section, apply the rock allowance, convert to cubic yards, then use the entered density for tons.
How do I split the rock between boulders, cobble and pebbles?
The planner applies your entered percentage mix to the total required tonnage so each rock class remains tied to the same channel volume.
How is landscape fabric estimated?
Fabric follows the channel bottom, both side slopes and the selected extension past each bank, then adds the entered fabric allowance. The 1 ft per-bank extension is an editable starting point, not a universal specification. Allow for seams (often 6–12 in overlap where manufacturer guidance calls for it) and confirm roll layout, anchoring and product instructions before ordering.