Gravel Calculator
Enter the project dimensions to estimate cubic yards, tons, bags and delivered cost.
Tell us what you're planning
Project areas
Add separate sections instead of forcing the project into one rectangle.
How much gravel do I need?
For a rectangular area, cubic yards = length (ft) × width (ft) × depth (in) ÷ 324. For round areas, use the circle option; for triangular sections, use base × height ÷ 2; and for irregular sections, enter a known square-foot area or split the project into multiple simple sections.
Worked example: a 20 ft × 10 ft area at 3 in deep is 50 cubic feet, or about 1.85 cubic yards. The planner then keeps density, extra material, compaction, minimum loads and sales increments visible so you can turn that geometry into an order quantity.
Not sure which gravel to ask for?
Start with the job the material needs to do, then confirm the exact local product with the supplier. Names and gradations vary by quarry and region, so the options below are useful starting points rather than universal specifications.
Make the supplier quote order-ready.
The tonnage is only part of a bulk-material order. A useful quote should make the product, delivery assumptions and purchase rules clear enough that you can compare suppliers on the same basis.
What the result means
Why does the recommended order exceed the exact tonnage?
The planner can apply extra material, a compaction allowance, a supplier minimum and the supplier's sales increment. The result shows the exact planning quantity separately from the order quantity so you can see what changed.
Why is gravel density editable?
Bulk density varies with stone type, gradation, moisture and supplier. Presets are planning values only. A supplier-provided density or yield should take priority.
Does the planner tell me the correct construction depth?
No. Project-type depths are editable starting points for planning, not structural or code recommendations. Base preparation, drainage, soil, traffic and local requirements can change the appropriate section.
Does the price include tax, labor or equipment?
No. Cost output uses only the prices and fees you enter. Tax, equipment, labor, geotextile, edging, excavation and disposal are not included unless you add them outside this planner.
How does quote checking handle different units?
The planner converts per-ton and per-cubic-yard quotes through the same editable material density. It checks the quoted quantity against the project requirement, then shows the entered delivered cost. A second quote can be compared once both quotes cover the calculated need.
How this estimate is calculatedFormula, rounding and example
How the gravel estimate is built
- 1Convert each measured area and depth into cubic volume, then combine the project sections.
- 2Apply the editable extra-material and compaction allowances before converting volume to weight with the selected density.
- 3Apply the supplier minimum and sales increment last so the recommendation reflects a quantity you can actually order.
Uses a 50 × 12 ft area at 4 in deep, 1.5 tons per cubic yard density, 5% extra material, 10% compaction allowance, a 3-ton minimum and 0.5-ton sales increments. It produces about 12.9 tons of calculated need and a 13-ton rounded order.
Use your own measurements and verify product coverage, local requirements and supplier terms before ordering.
Common gravel calculator questions
How do I calculate cubic yards of gravel?
Multiply area in square feet by depth in feet, then divide cubic feet by 27. In compact form: square feet × (depth in inches ÷ 12) ÷ 27. Apply any extra-material or compaction allowance after the base volume is known.
How much area does one cubic yard of gravel cover?
One cubic yard covers 324 sq ft at 1 inch deep, 162 sq ft at 2 inches, 108 sq ft at 3 inches, or 81 sq ft at 4 inches.
How do I convert gravel yards to tons?
Multiply cubic yards by the bulk density in tons per cubic yard. Density varies by material, gradation and moisture, so a supplier value should replace a planning preset when available.