Wood Fence Calculator

Estimate sections, posts, rails, pickets and concrete from a straight fence run, account for gate openings and extra terminal posts, see what material on hand can cover, work backward from a budget, or compare panel and linear-foot supplier quotes.

View estimate
PROJECT SETUP

Define your straight fence run

What to measureMeasure total fence length, note gate openings, and confirm the post spacing used by your plan.
Diagram is a measurement guide, not an installation detail.
1 · LAYOUT

Fence, gates and post spacing

2 · PICKETS & CONCRETE

Board spacing and post-hole geometry

Hole size and depth are user inputs. Check utility locations, frost-depth requirements and local rules before digging.

Pricing & deliveryOptional for quantity planning
3 · PRICING

Use your local material prices

How this estimate is calculatedFormula, rounding and example

How the wood-fence estimate is built

  1. 1Subtract gate openings from the run used for repeated fence sections.
  2. 2Count sections and posts from your spacing, then rails per section and pickets from actual board width plus gap.
  3. 3Calculate concrete from hole geometry and post displacement, then round every material to whole purchase units.
Example project

Uses a 100 ft fence with one 4 ft gate, 8 ft post spacing, 3 rails per section, 5.5 in pickets, a 0.5 in gap and 10% picket waste. It returns 15 posts, 36 rails, 212 pickets and 35 concrete bags.

Use your own measurements and verify product coverage, local requirements and supplier terms before ordering.

Common wood-fence calculator questions

How are fence sections counted?

Gate openings are removed from the repeated fence run, then the remaining length is divided by the selected post spacing and rounded as needed to create complete sections.

How are pickets calculated?

The usable fence run is converted to inches and divided by picket width plus the intended gap, then the selected waste allowance is applied and the order is rounded to whole pickets.

Why does concrete need its own calculation?

Concrete depends on post-hole diameter and depth and the space displaced by the post itself. A bags-per-post shortcut can over- or under-order when hole dimensions change.